Vietnamese company builds cement factory in Cambodia
In these days, workers of the Machinery Installation JSC No 18, a subsidiary of the Vietnam Machinery Installation Corporation (LILAMA) are urgently completing and running on trial basis a clinker production line for the Kampot Cement Factory in Cambodia.
The factory has a capacity of 2,500 tonnes of clinker a year, equivalent to 900,000 tonnes of cement a year.
This is the first cement factory abroad the company has won in bidding for construction. Of the total 7,000 tonnes of machinery equipment manufactured and installed for the factory, 1,200 tonnes have been manufactured in Vietnam.
Domestically, the Machinery Installation JSC No 18 is manufacturing and installing over 4,200 tonnes of equipment for the two cement factories in Binh Phuoc and Tay Ninh. (Nhan Dan)
Back Top page Print Email |